Target Energy to restart flow testing of West Texas well


(MENAFN- ProactiveInvestors - Australia) Target Energy (ASX: TEX) is set to restart flow testing at its Darwin-1 well in West Texas after issues with the gas metering system caused delays. Darwin-1 had flowed more than 240 barrels of oil per day during testing earlier this month before it was shut-in for pressure testing. However, problems with the metering system, which appeared to be undersized, meant that Target had to replace it before restarting the testing. Darwin-1 is the second WolfBerry Fusselman well in Target's Fairway project in Howard County, Texas, and is just 3 kilometres northeast of the BOA 12-1 well. Target owns a 60% working interest in Darwin-1.


Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.