Jordan- Load on power grid up 210MW


(MENAFN- Jordan News Agency) Amman, Aug. 25 (Petra) -- The load on the national grid on Friday reached 2,590 megawatts (MW), up 210MW compared with 2380MW last Friday, according to the National Electric Power Company (NEPCO).

NEPCO Production Planning Director Amin Zaghal blamed soaring temperatures up to 38 degrees Celsius for the extra 8 percent load on the national grid.

A SH
25/8/2017 - 07:56:06 PM

MENAFN2508201701170000ID1095772537


Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.