Dubai to launch Jumeirah Bridge on July


(MENAFN) Roads and Transport Authority (RTA) is set to open the entire Jumeirah Bridge starting from July 21 as part of the work related to the second phase of the Dubai Water Canal project.

On detail, the bridge contains three lanes in each direction and rises 8.5 meters above the canal, therefore enabling free navigation around-the-clock..

"Two lanes inbound from Jumeirah 3 outbound to Jumeirah 2 and two lanes coming from Jumeirah 2 heading towards Jumeirah 3 have already been opened", RTA said.


MENAFN

Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.