ABM Resources NL (ASXABU) Mineral Lease at Old Pirate Granted


Http://www.abnnewswire.net/rss2/menafn/abn_menafn_en.asp

ABM Resources NL (ASX:ABU) ("ABM" or "the Company") is pleased to announce that a Mineral Lease for the Twin Bonanza Gold Project has been granted for a term of 25 years



Mineral Leas



- Notification of grant of Mineral Lease received



Mineral Lease area covers



- Old Pirate, Golden Hind and Old Glory deposits



- the 6 kilometre long trend of gold-in-soil anomalism extending north and south of Old Pirate (the Old Pirate Trend) including the Corsair, Bermuda, and Bermuda South prospects



- the Buccaneer Porphyry Gold deposit; an



- infrastructure and camp areas



Darren Holden, Managing Director of ABM, said, "The granting of the mineral lease is an important milestone for ABM. It secures the title upon which we will develop our mining projects at Twin Bonanza



We acknowledge the traditional owners, the Central Land Council, the Northern Territory Department of Mines and Energy and the Commonwealth for their co-operation in this matter.



Mineral Lease 2982



Following the receipt of the notice of intent to grant on Friday (28/03/2014), the Company has now received the granted Mineral Lease title from the Department of Mines and Energy (NT). Mineral Lease 29822 covers 32.6 square kilometres and incorporates the 6 kilometre trend of the Old Pirate gold anomaly (including Golden Hind, Old Glory and the main Old Pirate Deposit) and the Buccaneer Porphyry Deposit along with infrastructure areas (Figure 1). ABM also has extensive granted exploration licenses in the surrounding area which will be subject to future brownfields exploration work



The Company is currently working on the remainder of the required environmental compliance and permitting, including supplements to the environmental impact statement and the preparation of the Mine Management Plan for filing with the relevant authorities for final authorisation to mine



General Update and Near-Term Wor



ABM will commence a detailed infill and extensional exploration program shortly. This program involves a drill out of the open-pit resource (top 50m) with the aim to convert the global resource estimation to local scale mining inventory or mineral reserve ahead of finalisation of open-pit designs. This program includes a detailed program of up to 30,000 metres of drilling as well as the excavation of over 3 kilometres of trenches. Extensional work includes following up on geological observations made during trial mining (refer announcement 25/02/2014)



- Northern extensions of Golden Hind targeting a multiple plunging shoot model



- Northern extensions of the Western Limb at Old Pirate



- Linking Old Pirate Central with Old Pirate South



- Southerly down-plunge extensions of the Old Pirate South high-grade shoot / fold nose



- Extensions to the Old Glory deposit; an



- The as yet untested high-grade vein systems at the Bermuda and Bermuda south zones



This work is expected to commence in April and will take approximately 3 months to complete. In parallel, the Company is progressing design and upgrade plans for the processing plant, and intends to proceed to mining during 2014



The gold-in-circuit recovery from the trial mining remains a work in progress. A certain amount of material recovered from the circuit requires soaking in acid for an extended period of time to remove iron oxide and other metals prior to the mechanical upgrade of the gold concentrate. Further information will be presented on conclusion of this work



To view figures, please visit

Http://media.abnnewswire.net/media/en/docs/ASX-ABU-672746.pd


Legal Disclaimer:
MENAFN provides the information “as is” without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the provider above.